Analisis Waktu Menggunakan Microsoft Project Pada Pekerjaan Gedung A1 Pemondokan Upt. Asrama Haji Embarkasi Aceh
DOI:
https://doi.org/10.55616/prince.v1i2.316Keywords:
Time, Quantitative Method, Network Planning, Time Schedule, Microsoft ProjectAbstract
With current technological developments, it affects construction management where computer programs can simplify the process of making reports, activities, controlling, and controlling the activities of a project. The object of this research is the A1 Building for the Hajj Embarkation Dormitory in Aceh, which is located on Teuku Nyak Arief Street, Kuta Alam District, Banda Aceh City. This building project is scheduled for 180 days starting from 05 July 2021-05 December 2021 with a budget of Rp 28,370,150,000.00 (Twenty Eight Billion Three Hundred Seventy Million One Hundred Fifty Thousand Rupiah). an effective and efficient time duration is obtained by reviewing structural work from the 1st, 2nd, 3rd, 4th, and rooftop floors. Primary data obtained are the number of workers. Secondary data is obtained from literature studies and related agencies as build drawing and time schedule. The results of the research are that there is an accelerated time duration for structural work from 91 days to 85 days with an initial work date of 09 August 2021- 07 November 2021 to 09 August 2021-01 November 2021. The benefit of the research is to provide solutions the fastest time by comparing the time schedule obtained from contractors and Microsoft Project 2019 software.
References
Ervianto, W.I 2005. Manajemen Proyek Konstruksi. Yogyakarta: ANDI
I gede Ngurah Sunatha, dkk. 2021. Analisis Optimasi Waktu Kegiatan Pada Proyek Pembangunan Gedung C SMPN Denpasar Dengan Microsoft Project 2007. Universitas Mahasaraswati Denpasar
Ervianto, W.I. 2004. Teori Aplikasi Manajemen Proyek Konstruksi. Yogyakarta: ANDI
Abrar Husen. 2009. Manajemen Proyek. Yogyakarta: Andi
Imam Soeharto. 1999. Manajemen Proyek jilid I dan II. Erlangga. Jakarta: Erlangga
Luthan, P.L.A dan Syafriandi. 2005. Aplikasi Microsoft Project Untuk Penjadwalan Proyek Teknik Sipil. Yogyakarta: Andi offset
Setiawan Ikhsan. 2009. Rescheduling Waktu Pekerjaan Guna Optimasi Biaya Pembangunan Rusunawa Siwalankerto Surabaya
Hardani, dkk. 2020. Metode Penelitian Kualitatif Dan Kuantitatif. Yogyakarta: CV. Pustaka Ilmu
Sugiyono. 2017. Metode Penelitian Kuantitatif, Kualitatif, dan R&D. Bandung: CV Alfabeta
Ardani. 2009. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan (Studi Kasus: PT. Sabaritha Perkasa Abadi, PT. Sinar Kasih Reinhard, PT. Dian Perkasa). Universitas Sumatera Utara
Arikunto Suharsimi. 1989. Manajemen Penelitian. Departemen Pendidikan dan Kebudayaan Direktorat Jenderal Pendidikan Tinggi Proyek Pnegembangan Lembaga Pendidikan Tenaga Kependidikan Jakarta
Fiki Aryani, dkk. 2016. Analisa Penerapan Manajemen Waktu Pada Proyek Konstruksi Jalan Lingkungan Lokasi Kalimantan Barat. Universitas Tanjungpura Pontianak
Frederika, Ariany. 2010. Analisi Percepatan Pelaksanaan dengan Menambah Jam Kerja Optimum pada Proyek Konstruksi. Universitas Udayana Denpasar
Noviyanthy Handayani, dkk. 2018. Pengendalian Waktu Biaya Pekerjaan Konstruksi Dengan Menggunakan Microsoft Project 2010 (Studi Kasus: Proyek Pembangunan Rumah Sakit Umum Daerah Kalampangan Kota Palangkaraya. Universitas Muhammadiyah Palangkaraya
Syfa Safitri. 2021. Analisis Penjadwalan Proyek Gedung Menggunakan Metode CPM-PERT (Studi Kasus Proyek Pembangunan Gedung APSLC Universitas Gadjah Mada). Universitas Islam Indonesia
Zulfikram, Abdul Muhyi, dkk. 2018. Rencana Waktu pelaksanaan Proyek Peningkatan Jalan Iskandar Muda Dengan Menggunakan Aplikasi Microsoft Project 2016. Politeknik Negeri Lhokseumawe
Published
How to Cite
Issue
Section
Copyright (c) 2022 PRINCE : Journal of Planning and Research in Civil Engineering

This work is licensed under a Creative Commons Attribution 4.0 International License.
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.