Pengaruh Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung di Banda Aceh dan Aceh Besar

Authors

  • Cut Annisa Widya Sari Mastura Universitas Syiah Kuala
  • Buraida Buraida Universitas Syiah Kuala
  • Nurisra Nurisra Universitas Syiah Kuala
  • Jihan Fardila Tari Universitas Syiah Kuala

DOI:

https://doi.org/10.55616/prince.v4i3.1072

Keywords:

Project Manager Competence, Knowledge, Skill, Attitude, Construction Project Success

Abstract

The construction sector is a major pillar of development and continues to grow across regions. Project success is strongly influenced by human resource quality, particularly the managerial competence of the project manager. This competence includes knowledge, skills, and attitude, which ensure that projects are completed on budget, on quality, and on schedule. However, field conditions still show gaps, such as the appointment of project managers without sufficient capacity, leading to delays, cost overruns, and quality issues. This study examines the influence of project manager competence on the success of building construction projects in Banda Aceh and Aceh Besar. The research approach uses a qualitative method with a descriptive approach. Data were collected through questionnaires distributed to contractors and supervising consultants, involving 35 respondents. The independent variables are knowledge (X1), skill (X2), and attitude (X3), while the dependent variable is project success (Y). The results show that all three competency variables significantly affect project success, indicated by an F-test value of 0.018 (< 0.05). The regression equation is Y = 14.105 + 0.152X1 + 0.139X2 + 0.178X3. The R² value of 0.272 shows that 27.2% of project success is influenced by project manager competence. The study highlights the importance of improving competence, especially attitude as the most dominant factor.

References

[1] R. Handayani, A. Frederika, and A. A. Wiranata, “Analisis Faktor-Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Gedung Di Kabupaten Jembrana (Studi Kasus : Pembangunan Proyek Gedung Di Kabupaten Jembrana),” J. Hari. Reg., vol. 2, 2013, [Online]. Available: https://jurnal.harianregional.com/jieits/id-5095

[2] W. I. Ervianto, Manajemen Proyek Konstruksi, Revisi. Andi Yogyakarta, 2005.

[3] Indah Prasetiya Rini, “PENGARUH PRODUKTIVITAS TENAGA KERJA TERHADAP KINERJA WAKTU PROYEK PADA BANGUNAN BERTINGKAT,” J. Infrastruktur, vol. 3, no. 2, pp. 127–135, Jul. 2019, doi: 10.35814/infrastruktur.v3i2.715.

[4] A. T. Y. Tambunan, “Analisis Manajemen Risiko Proyek Konstruksi terhadap Kinerja Waktu Proyek,” Universitas Sumatera Utara, 2021. [Online]. Available: http://repositori.usu.ac.id/handle/123456789/38682

[5] A. B. Siswanto and M. A. Salim, Manajemen Proyek, no. November 2019. Pilar Nusantara, 2021.

[6] N. Sitanggang, J. Simarmata, and P. L. A. Luthan, Pengantar Konsep Manajemen Proyek Untuk Teknik. Yayasan Kita Menulis, 2019.

[7] H. Dimyati and K. Nurjaman, Manajemen Proyek, 1st ed. Bandung: CV. Pustaka Setia, 2014.

[8] I. Heryanto and T. Triwibowo, Manajemen Proyek Berbasis Teknologi Informasi. Bandung: Informatika Bandung, 2013.

[9] H. A. Rani, Manajemen Proyek Konstruksi. Deepublish Publisher, 2016.

[10] P. Guide and F. Edition, A Guide to the Project Management Body of Knowledge. Project Management Institute, Inc., 2013.

[11] E. Shaw, “8 Attitudes Towards Success for Project Manager.” [Online]. Available: https://www.projectsmart.co.uk/forums/viewtopic.php?t=828.

[12] D. M. Vernia and L. Sandiar, “Peranan Kompetensi Kerja Terhadap Kepuasan Kerja Dan Kinerja,” J. Ilm. WAHANA Pendidik., vol. 6, 2020, doi: https://doi.org/10.5281/zenodo.3737979.

[13] B. Pujiyono, Konsep Manajemen Proyek. Last modified, 2017.

[14] I. A. A. Brahmantariguna, G. C. Dharmayanti, and I W. Yansen, “Hubungan Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung,” J. Spektran, vol. 4, no. 2, pp. 55–62, 2016.

[15] A. A. Firdausi, “Meta-Analisis: Project Manager dan Proyek Sukses,” J. Media Komun. Dunia Ilmu Sipil, vol. 1, pp. 16–24, 2022, doi: https://doi.org/10.32585/modulus.v4i1.2441.

[16] Saluri, “The Effect Of Project Manager Competence On Project Success In Construction Service Contractor Companies,” J. Sci., vol. 12.

[17] K. Prianto, S. M. Dewi, and A. Pujiraharjo, “Pengaruh Kompetensi Manajer Proyek Terhadap Keberhasilan Proyek Pada Perusahaan Kontraktor Di Kabupaten Malang,” vol. 10, pp. 156–168, 2012.

[18] Y. I. Silalahi, L. Masthura, and N. Fahriana, “Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi,” J. Komposit J. Ilmu-ilmu Tek. Sipil, vol. 7, no. 2, pp. 233–239, 2023, doi: 10.32832/komposit.v7i2.14240.

[19] A. A. G. A. Yana, A. A. D. P. Dewi, and Y. K. K. Harefa, “Faktor-Faktor Yang Mempengaruhi Kinerja Proyek Dalam Pelaksanaan Proyek Konstruksi Gedung (Studi Kasus: Proyek Pemerintah Kabupaten Badung),” J. Hari. Reg., vol. 8, 2020.

[20] K. ADITAMA, “Analisa Faktor-Faktor Keberhasilan Manajemen Proyek Pada PT. Sucofindo (Persero),” Institut Teknologi Nasional, 2021. [Online]. Available: https://eprints.itenas.ac.id/1465/

Downloads

Published

11/27/2025

How to Cite

Mastura, C. A. W. S., Buraida, B., Nurisra, N., & Tari, J. F. (2025). Pengaruh Kompetensi Project Manager Terhadap Keberhasilan Proyek Konstruksi Gedung di Banda Aceh dan Aceh Besar. Journal of Planning and Research in Civil Engineering, 4(3), 707–713. https://doi.org/10.55616/prince.v4i3.1072

Issue

Section

Articles