1.
Dayunita W, Pramanda H, Ariansyah D, Bunyamin B. Analisa Penambahan Waktu Kerja (Jam Lembur) Terhadap Biaya Pelaksanaan Proyek Dengan Metode Time Cost Trade Off (Study Kasus Gedung Badan Kepegawaian Aceh). PRINCE [Internet]. 2024 Nov. 30 [cited 2026 Jul. 19];3(3):452-8. Available from: https://ejournal.unida-aceh.ac.id/prince/article/view/841