Kajian Manajemen Risiko pada Proyek Pembangunan di Kabupaten Aceh Jaya
DOI:
https://doi.org/10.55616/prince.v5i1.1155Keywords:
Quantitative, Questionnaire, Risk Management, Project Development, RespondentsAbstract
Aceh Jaya Regency is one of the developing regions in Aceh, where infrastructure development is being intensified, particularly the construction of the Paya Baro - Teupin Ara road aimed at improving community accessibility due to previously damaged and inadequate road conditions. This study aims to identify and analyze the risks affecting project implementation and to formulate appropriate mitigation strategies. A quantitative approach was employed through the distribution of questionnaires to 35 respondents, consisting of the owner, consultants, contractors, workers, and local community, with data processed using Microsoft Excel and supported by validity and reliability testing of the research instruments. The results indicate that construction work factors are the dominant contributors to project risk, with the overall risk level predominantly classified as moderate (98), followed by low risk (31) and high risk (11), while no extreme risk was identified. These findings suggest that the project implementation is relatively under control; however, improvements in risk management are still required, particularly in planning, execution control, occupational safety, and environmental management. Therefore, this study provides valuable insights as a basis for decision-making to enhance the effectiveness of risk management in sustainable road construction projects.
References
[1] Arikunto, S. 2005. Manajemen Penelitian. Cetakan ketujuh. Jakarta: PT. Asdi Mahasatya
[2] Arisman, 2021. Analisis Manajemen Risiko Terhadap Pelaksannaan Pembangunan Konstruksi Gedung Bertingkat Di Kabupaten Dhamasraya. Universitas Muhammadiyah Sumatera Barat.
[3] Darmaei Herman 2005, Manajemen Resiko, Jakarta : Bumi aksara
[4] Darmawi, Hcrmawan. 2011. Manajemen Risiko, Bumi Aksara, Jakarta
[5] Hanu, D. S. 2021. Analisa Majemen Risiko Pada Pelaksanaan Pembangunan Proyek Konstruksi Khususnya Bangunan Bertingkat Tinggi Di Kota Semarang.
[6] Ismael, I, Junaidi, (2013). Keterlambatan Proyek Kontruksi Gedung Faktor Penyebab Dan Tindakan Pencegahannya.
[7] Jurnal Labombang, M.,2011, Resiko Dalam Proyek Konstruksi. Jurnal Smartek.
[8] Kiswati, Sri. Chassanah, Ummi. Subekti, Sri. 2020. Analisis Manajemen Risiko Bekisting Konvensional Pada Pelaksanaan Pembangunan Proyek The Trans Icon Surabaya.
[9] Kurniawan, D. 2018. Identifikasi Faktor Resikoyang Mempengaruhi Kinerja Waktu Pelaksanaan Kontruksi Gedung Secara Swakelola. Bukit tinggi: Rang Teknik Joernal. Vol.1.
[10] Muhammad. 2008. Manajemen Pembiayaan Mudharabah Di Bank Syariah. Jakarta: PT Raja Grafindo Persada..
[11] Moi, Fransiska. I.G.A. Neny Purnawirati, 2021, Analisis Manajemen Risiko Proyek Pembangunan Ruas Jalan Baru. Waebetu Tarawaja.
[12] Priana, S. E., Carlo, N., & Yulius, M. N. (2014). Analisis Faktor-Faktor Yang Mempengaruhi Kinerja Mutu Pada Proyek Konstruksi Gedung Di Kota Padang Panjang. Jurnal Program Pascasarjana, 5(3).
[13] Reyner, R. Rumimper. 2015. Analisa Resiko Pada Proyek Konstruksi. Minahasa.
[14] Riduwan, 2010. Metode Dan Teknik Menyusun Tesis. Alfabeta. Bandung.
[15] Rustam, B. R. 2017. Manajemen Risiko: Prinsip, Penerapan, Dan Penelitian. Jakarta: Salemba Empat.
[16] Sanusi, A. 2017. Metode Penelitian Bisnis. Cetakan Ketujuh, Penerbit Salemba Empat. Jln. Raya Lenteng Agung No.101, Jagakarsa, Jakarta Selatan, 12610..
[17] Schlegel, G. L. &, Trent R. J. 2015. Supply Chain Risk Management: An Emerging Discipline: CRC Press.
[18] Sekaran, 2006. Metode Penelitian Untuk Bisnis. Jilid II jakarka salemba 4..
[19] Soeharto, I, 1997. Manajemen Proyek Dari Konsep Sampai Operasional. Erlangga, Jakarta.
[20] Soeharto, Iman. 1999. Manajemen Proyek. Edisi kedua. Jakarta : Erlangga.
[21] Sudaryono Bambang 2015. Analisis Manajemen Risiko Perusahaan (Enterprise Risk Management) Dan Kepatuhan (Compliance) Terhadap Kinerja. Universitas Lampung.
[22] Sugiyono. 2017. Metode Penelitian Kuantitatif, Kualitatif, Dan R&D. Bandung : Alfabeta.
[23] Supriyadi. 2017. Hubungan Konflik Kerja Keluarga Terhadap Motivasi Kerja Dengan Dukungan Sosial Sebagai Variabel Pemoderasi Pada Perawat Wanita Bali Di Rumah Sakit Di Bali. Jurnal Psikologi Udayana, 4(1), 183-197.
[24] Tjakra, Jermias. 2011. Analisis Resiko Pada Proyek Konstruksi Perumahan Di Kota Manado.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 PRINCE : Journal of Planning and Research in Civil Engineering

This work is licensed under a Creative Commons Attribution 4.0 International License.
Ciptaan disebarluaskan di bawah Lisensi Creative Commons Atribusi 4.0 Internasional.