Zaiyanna Fitri, Dedek Ariansyah, and Heru Pramanda. 2022. “Analisis Waktu Menggunakan Microsoft Project Pada Pekerjaan Gedung A1 Pemondokan Upt. Asrama Haji Embarkasi Aceh”. Journal of Planning and Research in Civil Engineering 1 (2):60-67. https://doi.org/10.55616/prince.v1i2.316.