DAYUNITA, W.; PRAMANDA, H.; ARIANSYAH, D.; BUNYAMIN, B. Analisa Penambahan Waktu Kerja (Jam Lembur) Terhadap Biaya Pelaksanaan Proyek Dengan Metode Time Cost Trade Off (Study Kasus Gedung Badan Kepegawaian Aceh). Journal of Planning and Research in Civil Engineering, v. 3, n. 3, p. 452-458, 30 Nov. 2024.