[1]
Bunyamin, B., Sabri, R., Pramanda, H. , Ariansyah, D. and Kamalia, K. 2025. Perbandingan Biaya Kontrak dan Mutual Check Awal Pada Pekerjaan Pelat Lantai. Journal of Planning and Research in Civil Engineering. 4, 1 (Mar. 2025), 530-541. DOI:https://doi.org/10.55616/prince.v4i1.936.