[1]
Zaiyanna Fitri, Dedek Ariansyah and Heru Pramanda 2022. Analisis Waktu Menggunakan Microsoft Project Pada Pekerjaan Gedung A1 Pemondokan Upt. Asrama Haji Embarkasi Aceh. Journal of Planning and Research in Civil Engineering. 1, 2 (Nov. 2022), 60-67. DOI:https://doi.org/10.55616/prince.v1i2.316.