Abstract

Indonesia's current electrification ratio is 87%, this shows that 8.5 million Indonesians or the equivalent of 2500 villages do not have electricity. Indonesia's geographical location is one reason why there are still many areas that have not been reached by the State Electricity Company (PLN), such as Siumat Island. Siumat Island is an area located on Simeulue Island, Simeulue Regency, East Simeulue District, is one of the areas where people have never experienced the use of electrical energy like other areas in big cities on the island of Sumatra. The electricity network in this area has not yet been entered because the reach of the PLN network to enter remote areas such as Pulau Siumat Village is complicated. After all, getting to Siumat Island from Simeulue Island takes approximately 3 hours by sea. The purpose of this study is to analyze from an economic perspective the construction of a solar power plant for the area. From the results of the discussion using the Calculation method, the Planning, Design and Needs Analysis approach, it was found that planning a solar power plant in Pulau Siumat Village was necessary. As a result, with a total of 62 housing units, 3 public facilities and public lighting, the total power required is 38.675 kW. To meet this need, 320 units of solar panels are needed, 372 units of batteries with a capacity of 12 V 250 Ah, 16 units of charge controllers with a total of 300 Ampere and 3 units of inverters with a capacity of 15 kW with the power to be generated is 40kW or 50 kVA. For the needs mentioned above, a budget of IDR 3,946,184,500 is needed.

Author Biographies

Aditya Chandra, Universitas Iskandar Muda

Fakultas Teknik Program Studi Teknik Elektro

Martunis, Universitas Iskandar Muda

Fakultas Teknik Program Studi Teknik Elektro

References

I. Renaldy Rahman, Saiful Karim, “Analisis Perencanaan Pembangkit Listrik Tenaga Surya Offgrid Untuk Rumah Tinggal di Kota Banjarbaru”.

A. W. H. Rinna Hariyati, Muchamad Nur Qosim, “Konsep Fotovoltaik Terintegrasi On Grid dengan Gedung STT-PLN,” vol. 11, no. 1, pp. 17–26, 2019.

T. Thamrin, E. Erlangga, and W. Susanty, “Implementasi Rumah Listrik Berbasis Solar Cell,” Explor. J. Sist. Inf. dan Telemat., vol. 9, no. 2, 2018.

A. N. Usman, A. Syuhada, and H. Hamdani, “Kaji Prospek Pemanfaatan Sistem Pembangkit Listrik Hibrida Energi Angin dan Matahari di Desa Langi Kepulauan Simeulue,” J. Tek. Mesin Unsyiah, vol. 3, no. 1, pp. 17–23, 2015.

I. Purwanto, “Solar Cell(Photovoltaic/Pv)Solusi Menuju Pulau Mandiri Listrik,” J. Penelit. Dan Karya Ilm. Lemb. Penelit. Univ. Trisakti, vol. 5, no. 2, pp. 117–126, 2020.

G. H. Sihotang, “Perencanaan Pembangkit Listrik Tenaga Surya Rooftop Di Hotel Kini Pontianak”.

F. Husni, Syukri, Muliadi, and T. M. Asyadi, “Perencanaan Sistem Pembangkit Listrik Tenaga Surya ( PLTS ) Di Gedung Pasca Sarjana Universitas Iskandar Muda,” vol. 2, no. 1, pp. 19–24, 2022.

S. Muslim, K. Khotimah, and A. N. Azhiimah, “Analisis Kritis Terhadap Perencanaan Pembangkit Listrik Tenaga Surya (PLTS) Tipe Photovoltaic (PV) Sebagai Energi Alternatif Masa Depan,” Rang Tek. J., vol. 3, no. 1, 2020.

D. Irwansyah, W. Yandi, W. Sunanda, and M. Y. Puriza, “Konversi Energi Listrik Pada Pembangkit Listrik Tenaga Surya dan Pembangkit Listrik Tenaga BayuSebagai Perencanaan Pembangkit Hybrid,” no. November 2020, pp. 113–127.

E. D. Bambang Winardi , Agung Nugroho, “Perencanaan Dan Analisis Ekonomi Pembangkit Listrik Tenaga Surya (PLTS) Terpusat Untuk Desa Mandiri,” vol. 16, no. 2, pp. 1–11, 2019.

Muliadi and I. D. Sara, “A New Method for Finding The Maximum Power Point of The Output Power of A Solar Panel with Multiple Peaks,” in International Conference on Electrical Engineering and Informatics (ICELTICs), 2020, pp. 15–19.

M. Saleh, Adiguna, and A. Safentry, “Analisa Perkiraan Kemampuan Daya Yang Di Butuhkan Untuk Perencanaan Pembangkit Listrik Teenaga Surya (PLTS),” J. Chem. Inf. Model., vol. 53, no. 9, pp. 1689–1699, 2017.

B. S. Yenni Afrida, Fitriono, “Perencanaan Pembangkit Listrik Tenaga Surya Solar Home System,” vol. 02, no. 1, pp. 23–27, 2021.

H. Riafinola, I. K. L. N. Suciningtyas, I. Sholihuddin, and W. R. Puspita, “Rancang Bangun Pembangkit Listrik Tenaga Surya pada Penggunaan Listrik Rumah Tangga,” J. Appl. Electr. Eng., vol. 6, no. 2, pp. 79–84, 2022.

Published

2023-06-30

Issue

Section

Articles